Road construction update: June 17

Road construction update: June 17
Posted on 06/14/2019

Road construction is scheduled for the week of June 17, weather permitting. Use caution in work zones and obey traffic control signage and flaggers. For real-time traffic impacts, go to TripCheck.com.

Bridge Street (between Holden Creek Rd - MP 0.00 and Deerhorn Road - MP 0.295): Bridge Street Bridge (Bridge No. 39C111) will be closed for a deck replacement and truss painting work from June 17, 2019 through September 1, 2019. Use the Deerhorn Road Detour.  Deerhorn Park Boat Ramp will also be closed during the bridge closure. 


Centennial Boulevard
 (M.P. 0.000 to 0.349), Aspen Street (M.P. 0.000 to 0.181) & Sequoia Avenue (M.P. 0.000 to 0.280):  
Roadway work to occur relative to a pavement preservation project along Centennial Boulevard between I-5 and Aspen Street, Sequoia Avenue between Aspen Street and Cottonwood Avenue to include the culs-de-sac, and Aspen Street between Centennial Boulevard and Kellogg Road.   Traffic to be controlled by flaggers and traffic control devices. Trucks and workers will be in the road so drivers should use caution and slow down through the work zones.  Drivers are advised to find alternative routes to avoid delays.  Parking restrictions will occur so please check for no parking signs.


Coburg Road
(M.P. 3.305 to 4.836): 
Roadway, sidewalk and ADA curb ramp work to occur along Coburg Road from Kinney Loop to McKenzie View Drive.  Traffic will be shifted using traffic control devices.  Bridge work near Armitage Park will occur and night work will likely occur. Trucks and workers will be in the road so drivers should use caution and slow down through the work zones.  Drivers are advised to find alternative routes to avoid delays. 

 

Coburg Road (M.P. 6.601 to 7.366):  Roadway, water line, sidewalk and ADA curb ramp work will occur along Coburg Road from Vintage Way to Coburg Bottom Loop.  Traffic will be controlled by flaggers and traffic control devices. Trucks and workers will be in the road so drivers should use caution and slow down through the work zones.  Drivers are advised to find alternative routes to avoid delays. 


Santa Clara/River Road (north of Maxwell Rd.): Crack seal and vegetation crews will continue prepping streets for an upcoming slurry seal project north of Beltline between Canterbury Street and River Road north of Beltline.  Watch for “no parking” signs. 

 

 

For more information about our summer construction projects, visit www.lanecounty.org/summerconstruction.

To plan your route on TripCheck, visit www.tripcheck.com.

TripCheck Masthead